A business building, workshop or warehouse is sold to an occupier or an investor. Its industrial past counts as much as its square metres: classified installations, soil pollution, compliance.
What the firm does
Our roadmap
- The site's history. We research the activities carried out, classified installations and any pollution, using public databases and your archives.
- Valuation. Floor area, ceiling height, HGV access, loading bays, electrical capacity, local planning zoning, and rent if the building is let.
- The lease, if it is let. Type of lease, remaining term, rent, reinstatement obligations at the end of the lease.
- The file. Surveys, planning permissions, certificates of compliance and inspection reports.
- Marketing. Presentation to businesses and investors, technical viewings, feedback after the viewings.
- Offers. We talk with each prospective buyer to understand their plans and assess how sound their financing is.
- Signing. We send the complete file to the notary and follow the preliminary contract, the conditions precedent and the financing through to the final deed.
Documents to gather
- Title deed, plans, building permits.
- Surveys:
- Energy performance certificate, for enclosed, roofed and heated buildings.
- Asbestos report if the building permit was issued before 1 July 1997.
- Termite report, and information on dry rot, in areas designated by prefectoral order.
- Risks and pollution report, provided at the first viewing and less than six months old at the preliminary contract.
- Information on classified installations operated on the site and, where applicable, soil studies.
- Current leases and rent roll.
- For tertiary activities on at least 1,000 m² of floor space, alone or combined on the same site: OPERAT declaration certificate.
Rules specific to this type of sale
Classified installations. If an installation subject to authorisation or registration has been operated on the land, the seller must inform the buyer in writing and, to their knowledge, point out the significant dangers or drawbacks resulting from it (article L. 514-20 of the French Environmental Code). Failing this, if pollution makes the land unfit for its intended use, the buyer may, within two years of discovering it, seek cancellation of the sale, the return of part of the price or, if the cost is not disproportionate, the clean-up of the site at the seller's expense.
Soil pollution. The risks and pollution report states in particular whether the land is located in a soil information sector.
Right of first refusal. It concerns premises used for commercial or craft purposes, since law no. 2026-403 of 26 May 2026, warehouses are excluded. A let craft workshop is still covered: we check the use stated in the lease.
Points to watch
- An environmental liability discovered after the sale can be costly for the seller: the information must be complete and in writing.
- A change of use, to housing or offices, depends on the local planning scheme and on permits: it must be checked before being used as a price argument.
Further reading
Sources: French Environmental Code, notaires.fr (sale of building land), French Commercial Code. Cabinet Maurice Burger updated this page on 15 November 2026. It sets out the general rules and does not replace an examination of your situation, which we carry out with your notary.